Jump to content
×
Are you looking for the BariatricPal Store? Go now!

Looking at November surgery...anyone else in the long lead up?



Recommended Posts

Hello gang,

I had WLS in 2004. I was one of the early lap band recipients in Australia under Prof. Paul O'Brien. I did great and lost 46kg (101lbs), but then life set in and I had two kids and a suicidal husband so I let the weight creep back up. I had a revision in 2013 due to a hiatus hernia so large I was having esophageal spasms. So now, I'm at the heaviest I've ever been, and I've got a ventral hernia that goes from my navel to my sternum. My surgeon said he won't even try to fix it if my BMI is over 30 because it will just come right back. He then talked to me about how the lap band has fallen out of favor because it was not as effective as the original studies promised. He suggested a revision to a VSG, and set me up in my insurance's approval program for WLS.

The first step is the removal of the band and port and recovery from that. Surgery is scheduled for July 7th. After that I'll progress through the "hoop-jumping" to qualify for the VSG, which providing everything goes smoothly, I'll qualify for in October. So far no one has stated any pre-surgery weight loss requirements, but I have been studying the various plans and doctor's programs I've found online, as well as reading personal stories from support forums like this one, so I can get an aggregate view of the entire procedure both pre and post-op.

I must admit that the pendulum swings widely across what I've seen, both in program execution and in individual responses. Of course, I realize that there are outliers on every scale, and I'm averaging what I see. I got this little binder from the program introduction meeting (Dignity Health), and I've been adding my own research to it, things like print out of appropriate bariatric (or equivalent) Vitamins based on their recommendations, worksheets for tracking eating and drinking, pre and post-op Protein Shakes, mixes, and recipes, motivational type posters, and text documents on things like how digestion works, how Protein is used by the body, etc. Note, all the research is stuff from actual university or journal studies, I'm not taking answers from Reddit or Quora as facts!

I've decided the biggest issue I've seen is the grief process that hits people after the surgery when they suddenly realize they can't eat what they want. I've read a lot of threads (not just here) of people rebelling and hating themselves and hurting themselves because of this. I do not want to deal with this. I'm already working on changing my eating habits, albeit slowly. I want to be more in control of this transition than I've seen,

So, if you've read this far, my questions to you are:

Did you make any effort pre-op to really change your eating habits?

Did you experience grief or regret post-op if you didn't?

Did you regret your surgery for any reason OTHER than the food restriction/complications?

Thanks for discussing!

Share this post


Link to post
Share on other sites

Sorry, I don't have any advice for you @rustybeth, as I am new to the WLS journey. But I'm definitely here for this topic. Praying all goes well for you this second go round.

Share this post


Link to post
Share on other sites

Create an account or sign in to comment

You need to be a member in order to leave a comment

Create an account

Sign up for a new account in our community. It's easy!

Register a new account

Sign in

Already have an account? Sign in here.

Sign In Now

  • Trending Products

  • Trending Topics

  • Recent Status Updates

    • Bashbee91

      Hey guys new to the process looking forward to this new life. 
      · 0 replies
      1. This update has no replies.
    • Bugg

      Hi everyone! I’m brand new here. I just went through all my pre-op requirements per my insurance company and now everything has been submitted and I’m just waiting for final approval and my surgery date. I’ve been doing research, watching YouTube videos, TikTok’s, ect.. trying to prepare my mind and what to expect so I’ll be ready for the surgery. I was so sure and so set and so ready and excited. However, now that I’ve done everything & it’s almost here, I am sooooooo scared! I know why I want it bc I’ve tried everything and I just don’t feel like I can lose weight by myself. I’m tired of being overweight my entire life. I’m miserable, but I keep psyching myself out afraid of GERD bc I know how that can be and I don’t want to have to get a bypass after already gaining the courage to even get VSG. I’m scared of complications like I’mgoing to regret doing it and be depressed that I didn’t just be more disciplined and try again to lose the weight on my own even sitting here typing this knowing in my mind i just can’t and don’t possess the discipline. I’m also afraid I won’t be able to handle the restrictions of the sleeve. What do I eat? I don’t know how to eat healthy really and don’t enjoy healthy food. I don’t know how to do this! I feel so defeated!Someone tell me they felt anything similar to this or am I not ready? I thought I was. I am so tired of being sick and tired and so tired of myself and so tired of being stuck and stuck in this body and somebody different on the outside from what I feel inside. I just want to ball up and cry.
      · 0 replies
      1. This update has no replies.
    • buildabetteranna

      over 20 lbs down since4 the pre surgery diet and surgery on the 14th
      · 1 reply
      1. Selina333

        Yay!! Congrats. I know how good that feels. 🤩

    • Jenopolis

      Had a sleeve in 2017, lost over 100 pounds. Had a DS surgery this year (2025) for more sustainable weight loss. 🤞
      · 0 replies
      1. This update has no replies.
    • buildabetteranna

      The 14th was my day. I am home and recovery is going pretty smooth. They even let me walk out of the hospital. Picture of me in recovery curtesy of my boyfriend lol. 

      · 3 replies
      1. DaisyChainOz

        Glad it went well!! Wishing you a speedy recovery and wonderful success!! 🤗

      2. buildabetteranna

        Thank you ❤️

      3. Selina333

        Neat you have a pic of this day! I was sooo happy to get my surgery. It was well worth it! And I'm not even near my goal. I had surgery Dec. 2!

  • Recent Topics

  • Hot Products

  • Sign Up For
    Our Newsletter

    Follow us for the latest news
    and special product offers!
  • Together, we have lost...
      lbs

    PatchAid Vitamin Patches

    ×